The installation time for external glass doors typically takes 1 to 3 days, depending on the door's size, structural complexity, on-site construction conditions, and whether it's a batch installation.
Standard single-leaf glass door (e.g., office or shop entrance): If measurements are accurate and all accessories are available, installation can be completed within one day. This includes removing the old door (if any), installing the door frame, fixing the tempered glass, and adjusting the floor spring and door closer.
Multiple-leaf or large-structure doors (e.g., office building entrances, shopping mall revolving doors): Involving multiple door leaves working together and custom hardware adjustments, it may take 2-3 days, especially if on-site adjustments to dimensions or wall finishing are required.
Batch installation projects (e.g., an entire office building): While the efficiency of installing individual doors increases, the overall project time can extend to over a week, mainly due to logistics and manpower scheduling. It's worth noting that pre-installation preparation is equally crucial:
Measurement and Ordering Cycle: It's recommended to complete measurements and place orders early in the renovation process. Custom production typically takes 7-15 days; avoid delays due to waiting for materials.
Site Requirements: Walls must be plastered or tiled, and the floor must be level to prevent contamination or damage caused by overlapping construction work.